StarFriend Screw focuses on the manufacturing of high-quality injection molding machine screws, customizing exclusive screws based on raw material characteristics, equipment parameters and injection molding processes. The truly economical choice is not only the lower purchase price, but also the comprehensive performance of plasticization stability, product quality, production loss and service life.

View Custom Solutions
PLASTIC MATERIALS & PLASTICIZING

Plastic Materials & Plasticizing

Plasticizing characteristics and screw matching for commodity plastics, engineering plastics, glass fibre, flame-retardant and corrosive materials.

← Return Plastic Materials & Plasticizing
Plastic Materials & Plasticizing

Temperature management for PSU and PESU materials plasticization

Release time:2026-09-26

quick answer

PSU and PESU require high-temperature processing and wetting, and equipment temperature control and material stay must be stable. The temperature management of the plasticization of PSU and PESU materials is illustrated by material mechanisms, plasticization parameters, risk diagnostics and certification methods, which help to stabilize the quality of retrofitting plants and reduce waste and equipment losses.

PSU与PESU材料塑化的温度管理英文技术示意图
PSU与PESU材料塑化的温度管理

Understanding the “temperature management of PSU and PESU material plasticization” requires that the physical flow of material structures, heat history and equipment be placed on the same chain of causality. The key mechanisms for this theme are that PSU and PESU need to be high-temperature and wet, and equipment temperature control and material stay must be stable. High-temperature, fluorine plastics and elastics impose more stringent requirements on equipment capacity, cleaning, safety, feed friction and time of stay. Therefore, the name of the material and the recommended setting can only be used as a starting point, and the actual judgement is to return to the plate number, water, filling and assistor, the single total quantity, cycle, screw structure and product requirements to confirm whether the temperature, cut and stay of the material in the equipment is safe.

At the test-model or volume-import stage, a list of inputs around “temperature management for the plasticization of PSU and PESU materials” should be established, including feedstock suppliers and batches, technical data sheets, drying conditions, the ratio of colored mothers and respirators, specifications of equipment to screws, weight of products and fluids, the temperature of the moulds and existing defects. The detection sites should cover dryer exports, aircraft-side pyrotechnics, air-launched molten products and products, so as to avoid drawing conclusions only at one point. The main risks to the subject are: silver silk for lack of drying, yellow transformation and black spots for local overheating or long stay. Parameters must be recorded in a specific pattern to distinguish material from equipment from operational changes.

Control methods should not begin with blindly increasing temperature or pressure, but should be based on "substance state - feed drying" The sequence of screw plasticization - nozzles and fluids - product results. Parameter optimization should give priority to ensuring that materials are free of hydrolysis, overheating and unsmelting, and then discuss speed, pressure and cycle; otherwise, the appearance of satisfactory may be at the expense of long-term performance. The site adjusts only one main variable at a time, while observing the actual melting temperature, measuring time, screw twists, mats, injection pressure, product weight, colour, scent and critical dimensions. If production can only be sustained by extreme parameters, the use of a switch to cover the material or hardware boundary should be discontinued.

The validation of “temperature management of PSU and PESU materials” suggests a replicable approach: water content, actual melting temperature, colour differential, pressure, stopover and mechanical performance. The acceptance should not be limited to “specifically satisfactory”, but should preserve the rules of location, instrument, sample, upper and lower limits and unusual disposal. The technical agreement between the supplier and the plant shall state the material, the sampling method, the detection project, the permitted scope and the change notification requirements. The plasticization programme can only be considered to have long-term quantitative value if the product ' s probabilities, performance, cyclicality, energy consumption and maintenance costs are met in a continuous production process.

SCREW & BARREL PRODUCTS

Injection molding screw product rolling display

According to the resin material, filling ratio, equipment model and product requirements, select a more suitable screw and barrel solution.